Welding Booths RFB 2017-12 – Links and Downloads

07/18/2018:
4) Delivery of booths revised to occur as late as September 14th.  Bid originally called for delivery by August 31st
07/12/2018:
1) Deadline for RFI’s – Revised to July 16th @ 5pm
2) RFI Responses by Bishop State – No later than July 18th @ 5pm
3) Bid Deadline – Revised to July 23rd @ 1pm
07/06/2018:
Alternate bid #2 revised and updated.  Please review new bid document, hit refresh on webpage and .pdf/download.  Hanging ventilation arm removed and replaced with backdraft/hooded ventilation system.

RFB 2017-12

Selected Architectural Drawings

RFB Response Sheet

RFB Checklist

W9 Fillable

State of Alabama Disclosure Fillable

Affidavits AL Fillable

E-verify MOU